-
Provisional Agricultural Land Classification (ALC)
Provisional Agricultural Land Classification Grade. Agricultural land classified into five grades. Grade one is best quality and grade five is poorest quality. A number of... -
Potential Special Protection Areas (England)
These are potential site boundaries. Please note that as a result of the consultation there may be minor changes to the final boundary of the site once classified. A Special... -
National Character Areas (England)
There are 159 Character Areas, each of which is distinctive with a unique 'sense of place'. These broad divisions of landscape form the basic units of cohesive countryside... -
Areas of Outstanding Natural Beauty (England)
AONBs are designated areas where protection is afforded to protect and manage the areas for visitors and local residents. Under the Countryside and Rights of Way Act 2000,... -
Ancient Woodland (England)
The inventory identifies over 52,000 ancient woodland sites in England. Ancient woodland is identified using presence or absence of woods from old maps, information about the... -
Spatial Prioritisation of Carbon Sequestration and Loss from Land Use 2023 (England)
This layer identifies some of the strategic opportunities in your area for positive change and work out plans with land managers to enhance carbon, whatever the current land... -
Climate change civil penalties
Civil Penalties issued under a climate change regime: UK Emissions Trading Scheme (UK ETS), European Union Emissions Trading Scheme (EU ETS), CRC Energy Efficiency Scheme (CRC),... -
Special Area of Conservation (time series)
Time series data for Special Area of Conservation (SAC). A Special Area of Conservation is the land designated under Directive 92/43/EEC on the Conservation of Natural Habitats... -
Convergence Areas (England)
Convergence is the level of the rebalancing of the direct payment to farmers within member states. The European Commission strongly supports the idea of setting an absolute... -
Water Temperature Projections for England's Rivers
Monthly water temperature projections for English rivers under the high-emissions "business as usual" RCP 8.5 (Representative Concentration Pathways) scenario. Attribution... -
WFD RBMP2 Risk Assessments - Transitional
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains transitional water bodies (estuaries) that are assessed to... -
WFD RBMP2 Risk Assessments - Protected Areas
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains protected areas (Shellfish Waters and Bathing Waters) that... -
WFD RBMP2 Risk Assessments - Lakes
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains lake water bodies that are assessed to be at risk of failing... -
WFD RBMP2 Risk Assessments - Groundwaters
This dataset contains risk assessment data produced to support the cycle 2 river basin management plans. It contains groundwater bodies that are assessed to be at risk of... -
WFD RBMP2 Reasons for Not Achieving Good Status
This dataset contains reasons for not achieving good status (RNAGS) data produced to support the cycle 2 river basin management plans. It contains water body elements that have... -
WFD RBMP2 Economic analysis 2015_Scenario 5_v1.7
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. The Scenario 5 dataset is based on... -
WFD RBMP2 Economic analysis 2015_Scenario 2_v1.7
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. This dataset gives Scenario 2... -
WFD RBMP2 Economic analysis 2015_Scenario 1_v1.0
The impact assessment (IA) for the updated river basin management plans was built from multiple data sources and is based on many assumptions. This dataset gives Scenario 1... -
WFD RBMP2 Confident Measures
A list of the measures which have been used to predict improvements in status by 2021 for specific elements in specific water bodies in England. The measures listed here are... -
River water body catchments rural urban classification
Rural-Urban classification of river water body catchments defined for Cycle 1 (2009-2015) of the Water Framework Directive (WFD). Created to assign WFD project spend to a rural...