Nitrogen geochemistry of igneous units from Loch Doon, Scotland (NERC Grant...
This dataset contains the nitrogen, oxygen, and lithophile element geochemistry of whole rock, and distribution coefficients, and stable isotope fractionation factors for... -
Radiocarbon dates of sediment slices from the MexiDrill core of Lake Chalco,...
The MexiDrill core was dated using a range of methods, including radiocarbon. Samples of sediment were pretreated (acid-only) at the 14CHRONO Centre according to established... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Longannet ScottishPower Carbon Capture & Storage (CCS) Consortium...
In March 2010, the Scottish CCS (Carbon Capture & Storage) Consortium began an extensive Front End, Engineering and Design (FEED) study to assess what would be required from... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the... -
Report: Kingsnorth E.ON UK Carbon Capture & Storage Front End Engineering...
During 2010-11, as part of the Carbon Capture & Storage (CCS) Demonstration Competition process, E.ON undertook a Front End Engineering Design (FEED) study for the...